Product details:
The characteristics of the product:
1, can be in wet base construction.
2, can be used for the upstream and the negative surface of the water.
3, water resistance, moisture resistance, excellent resistance to aging.
4, strong adhesion, active ingredients can penetrate into the cement slurry inthe base of micro cracks in Mao Xikong, and the formation of a densepolymeric surface waterproof membrane.
5, slurry is dried and no need for mortar protection layer can direct the follow-up process.
6, non-toxic, harmless, environmental protection type products.
Surface treatment:
1, the base surface should be smooth, clean and strong, no oil, no concrete release agent and sundries.
2, Yin Kok Department suggestions made into arc shape or a rhombus.
3, for the solution of sodium hydroxide with grease base 10% to scrub,reoccupy clear water rinse.
4, the hollowing, loose base, tip projection should eradicate and polymer(interface treatment agent) cement mortar repairing.
Construction technology:
1, the construction first wet surface to no Mingshui prevail should bewaterproof coating in dry surface, if the surface moist but not out of water can be directly repaired.
2, according to the product mix, the first into the water and the emulsion mixesmixing barrel, after adding the powder using electric blender stir, the rest 10minutes after stirring, until the mortar powder has no.
3, use brush or rolling brush will paste evenly on the surface, besmear ifbubbles, should repeatedly brushing the gas is exhausted, and pay attention to not leak brush or leave any defects.
4, paint finish first paste to the dry (about 2 hours), followed by second paste,the first brush with second perpendicular to the direction of.
5 to 24 hours, the waterproof layer is completely dry before it can enter theother construction of covering layer.
Matters needing attention:
1, air is very humid, not ventilated place, should use the ventilation equipmentto speed up the waterproof coating film, such as sealed drinking water pool or basement.
2, has completed the waterproof layer in the absence of a protective layer, notheavy with iron, nails, steel scaffolding caltrop construction or stacked in thewaterproof layer, so as not to destroy the waterproof layer.
3, is strictly prohibited to wear high heels or Ding's shoes to enter thewaterproof layer construction site, so as not to destroy the waterproof layer.
4, paste should maintain intermittent stirring in the construction process, in order to avoid precipitation.
5, no environmental construction in the rainy days or beyond 5 ℃ - 40 ℃.
6. The products
implement JC/T894 -2001 standard of polymer cement waterproof coating.
Storage mode:
In a cool and dry place, powder unopened can be preserved for 18 months.
Using the area: 6~10m2/ sets (each containing 3.5kg +9kg powder)
|